Overview
A master's thesis in Technology and Software, Data and Analytics, Business and Management, Energy and Sustainability at ABB, based in Vaesteras, Sweden; Sweden. Applications for this listing have closed. Compensation is not specified in the listing.
Key facts
- Opportunity type
- Master's thesis
- Organization
- ABB
- Location
- Vaesteras, Sweden; Sweden
- Field / discipline
- Technology and Software, Data and Analytics, Business and Management, Energy and Sustainability
- Application deadline
- 12 Oct 2026
- Funding / compensation
- Pay not specified
- Duration
- See source description
- Last source check
- 11 Oct 2026
Applications closed. This listing is kept for reference. Browse current opportunities.
Project description
At ABB, we help industries outrun - leaner and cleaner. Here, progress is an expectation - for you, your team, and the world. As a global market leader, we’ll give you what you need to make it happen. It won’t always be easy, growing takes grit. But at ABB, you’ll never run alone. Run what runs the world.This role sits within ABB's Robotics business, a leading global robotics company. We're entering an exciting new chapter as we’ve announced the plan for SoftBank Group to acquire ABB Robotics. SoftBank is a globally recognized technology group and investor/operator focused on AI, robotics, and next-generation computing. By joining us now, you’ll be part of a pioneering team shaping the future of robotics—working alongside world-class experts in a fast-moving, innovation-driven environment.This Position reports to:R&D Team Lead Your role and responsibilitiesDistributing controller functions across computing nodes could enable modular solutions for computationally intensive applications. This thesis offers the opportunity to explore how Time-Sensitive Networking (TSN) can support timing predictability and scalability in distributed industrial robot control.In this thesis, selected TSN traffic-shaping mechanisms and time synchronization will be evaluated using representative distributed industrial robot-controller workloads. Attention will be given to the coexistence of real-time controller traffic and non-real-time traffic on the same network. The objective is to assess how TSN configurations affect end-to-end timing, coordination and scalability, and to identify the runtime overhead and configuration complexity.Details:Period: Jan – June 2027 Number of credits: 30 ECTS/högskolepoäng (hp) Number of students for this thesis work: One Location: Västerås /HybridQualifications for the roleCurrently pursuing a master’s degree in computer science, Electrical Engineering, Embedded Systems, Automation, Robotics, or a related fieldKnowledge of real-time systems and time-critical computing conceptsExperience with networking protocols, industrial networks preferably Ethernet-based communication or Time-Sensitive Networking (TSN)Programming skills in C/C++ or Python for system analysis, simulation, or prototyping(Bonus) Familiarity with industrial automation, robotics, or motion control systemsMore about us Recruiting Manager Peter Rinderud, +46 72 464 46 84 or peter.rinderud@se.abb.com, will answer your questions. Positions are filled continuously. Please apply with your CV, academic transcripts, and a cover letter in English. We look forward to receiving your application!A Future OpportunityPlease note that this position is part of our talent pipeline and not an active job opening at this time. By applying, you express your interest in future career opportunities with ABB.We value people from different backgrounds. Could this be your story? Apply today or visit www.abb.com to learn more about us and see the impact of our work across the globe.
Requirements and eligibility
See the source description and original listing for specific eligibility requirements.
Application documents
See the source description and original listing for required application documents.
Funding, benefits and conditions
See the source description and original listing for additional benefits and employment conditions.
Contacts and supervision
See the source description and original listing for contacts and supervision details.
Before you apply
0 of 4 readyA preparation checklist, saved on this device. The official posting determines eligibility and required documents.
How to apply
Applications are closed according to the deadline or latest source check.
Source and listing information
Application source: abb.wd3.myworkdayjobs.com. Listing details may change; confirm them on the source site. A source check confirms page availability, not endorsement of the organization.
Report an outdated or incorrect listingFrequently asked questions
- What type of opportunity is this and where is it based?
- This is a master's thesis at ABB, based in Vaesteras, Sweden; Sweden.
- What is the application deadline?
- Applications are closed according to the deadline or latest source check.
- Is funding or compensation specified?
- Pay not specified. Check the original listing for exact amounts and conditions.
- Where can I apply and check the full requirements?
- Use the application link to abb.wd3.myworkdayjobs.com. The original listing provides the full requirements, documents and application instructions.
